Operation and Crisis Managment Room General Authority for Traffic

Project Details

Owner

Ministry of Interior

Consultant

Egyptian Intelligence Authority

Construction year

2009-2008

Construction period

8 months

 

Project Details

  1. Integrated electrical works including ups network and earthling works.
  2.  Low voltage works (sound – monitors – tel  internet – intercom …. etc.).
  3.  Central air conditioning works including  reciprocal control unit.
  4. CCTV works.
  5.  Firefighting, fire alarm and lighting works.
  6.  Marble and granite flooring including water  jet center piece.
  7. Decorative wooden cladding.
  8.  All types of false ceiling.
  9.  Raised floors.
  10. Supply and install the required metal and wooden 
  11.     consoles required for the room and office furniture.
  12. reinforced concrete structure and vip lounge.